Perfectly Green MUGA 13 2G artificial pitch
Why Perfectly Green MUGA 13?
MUGA 13 *available from April 24*
Perfectly Green MUGA 13 is a superb, versatile, and value for money synthetic turf surface for multi-use games projects.
MUGA 13 artificial grass is our popular sports surface ideally suited for schools and other small to medium sized projects and applications where a multi-use games area is required. It accommodates many different sports such as football, netball, hockey, and basketball. MUGA 13 is an ideal all-round sports pitch surface due to its excellent performance and durability.
Available in green with 4 different coloured line options, MUGA 13 requires a low sand content which allows for all-weather usage.
Need guidance and assistance?
Call 01825 729259 or email us
MUGA 13 specification
Surface description | 2G |
Pile height | 13mm |
Stock item or special order | Stock - rolls sizes 4m x 25m-30m |
Minimum bespoke pitch size | Not applicable - any sized pitch subject to stock availability |
Line colours available | White |
Lead time | If in stock, lead time is around 1-3 days from order and payment subject to delivery location and capacity of Perfectly Green delivery vehicles |
Suitable footwear | Moulded circular studs or flat soles |
Backing material | Latex |
Infill requirement | 4-6kgs/sqm rounded silica sand 0.2mm-0.75mm |
Play pad requirement | Yes, 10mm Play Pad |
Suitable activities | Football, hockey, netball, basketball |
Accreditation | NA |
Warranty | 7 years based on correct use and maintenance |
Need guidance and assistance?
Call us on 01825 729259 or email us
MUGA 13 installations
Need guidance and assistance?
Call us on 01825 729259 or email usInstallation guidance
Existing suitable base - tarmac, concrete or base already laid for current pitch
Step 1 | Make good any defects in surface - holes, cracks, dips |
Step 2 | Ensure suitable permeability. It’s not recommended to install grass on an existing surface which is not porous or will not allow drainage. A sloped surface will be ok, allow for water to escape from the lowest edge. A level surface can be made permeable by drilling holes into it. |
Step 3 | A 10mm play pad is recommended |
Step 4 | A sand dressing is required for 2G surfaces - check product specification tab for infill rate |
Step 5 | Ensure that joining tape and glue products are suitable for the project |
Step 6 | If using white /coloured line material install as per instructions. If using white/coloured line paint use product suitable for artificial grass |
Step 7 | Discuss the above steps with your contractor |
Small pitches - base required
Step 1 | Depending on soil type, remove 100mm to 200mm of soil |
Step 2 | If soil has poor drainage install a herringbone drainage system which feeds into a soakaway. If the soil is good draining this requirement is not necessary |
Step 3 | Install suitable edging to the area to retain sub base materials |
Step 4 | Install free draining, compacted, stable base using suitable aggregate materials |
Step 5 | The top surface may be compacted sharp sand, granite dust, or pourous tarmacadam |
Step 6 | A 10mm play pad is recommended for 2G surfaces |
Step 7 | Ensure that the joining tape and glue products are suitable for the project |
Step 8 | If using white /coloured line material install as per instructions. If using white/coloured line paint use product suitable for artificial grass |
Step 9 | Discuss the above steps with your contractor |
Large/Full sized pitch - base required
These projects require further consideration, planning, and discussion. Please contact us.
Need guidance and assistance?
Call us on 01825 729259 or email us
Care and maintenance
MUGA 13
This care and maintenance info sets out basic requirements for your new artificial grass sports or games surface. It is important to ensure the guidelines are followed, so to ensure you get the most enjoyment from the surface, that the lifetime and performance of the surface is maximised. Synthetic turf systems are not maintenance free, they are low maintenance.
Step 1 | Maintenance of the artificial surface is crucial to ensure maximum performance and enjoyment of the multi-use pitch. During the course of normal use the infill can be dispersed and the grass blades flattened so maintenance is required to redistribute the infill and lift the pile. A drag brush/compact tractor unit is required for this work |
Step 2 | Regular removal of leaves and litter will help to ensure that the surface and infill is not contaminated, leading to issues with drainage and performance |
Step 3 | Quarterly treatment for moss and weeds is recommended, using water based products. Once the treament has been applied all dead matter should be removed to avoid issues with drainage and performance |
Step 4 | Inspect the surface for damage and pay particular attention for any signs of roll joins opening up. Early remedial work is important where necessary |
Step 5 | Where paint has been applied to create lines, reapply as required. |
Need guidance or assitance?
Call 01825 729259 or email us
Products for Perfectly Green MUGA 13 artificial grass installations
2024 Perfectly Green Product Brochure
High quality artificial grass for:
- Landscaping, homes, gardens, urban, and commercial
- Putting greens, sports, schools, and playgrounds
- Events, exhibitions, and hospitality