DuraGame 4G artificial pitch
Why DuraGame 4G?
DuraGame 4G
DuraGame is produced from durable, high quality multi-use artificial turf, to provide the perfect all-weather playing surface for a wide variety of sports and recreation.
Create bright, colourful, and engaging multisport areas, to inspire children and encourage outdoor learning. Our multi use turf is manufactured using an elite grade texturised PE monofilament, in order to combine high performance playing characteristics, with the ultimate in durability and resilience.
Tested to FIH National for Hockey, and FIH Gen 2 for Multi Sports including Netball and Tennis..
Need guidance and assistance?
Call 01825 729259 or email us
DuraGame specification
Surface description | 4G |
Pile height | 24mm |
Stock item or special order | Special order |
Minimum pitch size | 800sqm. Possibly smaller if production shecule allows. Please check with us |
Line colours available | White |
Lead time | Bespoke special order pitch lead time is around 3-4 weeks |
Suitable foorwear | Moulded circular studs or flat soles |
Backing material | Latex |
Infill requirement | Optional 10kgs/sqm rounded silica sand 0.2mm-0.7mm |
Play pad requirement | Recommended 10mm Play Pad |
Suitable activities | Multi sports |
Accreditation | NA |
Warranty | 5 years |
Need guidance and assistance?
Call us on 01825 729259 or email us
DuraGame installation
Need guidance and assistance?
Call us on 01825 729259 or email usInstallation guidance
Existing suitable base - tarmac, concrete or base already laid for current pitch
Step 1 | Make good any defects in surface - holes, cracks, dips |
Step 2 | Ensure suitable permeability. It’s not recommended to install grass on an existing surface which is not porous or will not allow drainage. A sloped surface will be ok, allow for water to escape from the lowest edge. A level surface can be made permeable by drilling holes into it. |
Step 3 | A 10mm play pad is recommended |
Step 4 | A sand dressing is recommended for 4G surfaces - check product specification tab for infill rate |
Step 5 | Ensure that joining tape and glue products are suitable for the project |
Step 6 | If using white /coloured line material install as per instructions. If using white or coloured line marking paint using a product suitable for artificial grass |
Step 7 | Discuss the above steps with your contractor |
Small pitches - base required
Step 1 | Depending on soil type, remove 100mm to 200mm of soil |
Step 2 | If soil has poor drainage install a herringbone drainage system which feeds into a soakaway. If the soil is well draining this requirement is not necessary |
Step 3 | Install suitable edging to the area to retain sub base materials |
Step 4 | Install free draining, compacted, stable base using suitable aggregate materials |
Step 5 | The top surface may be compacted sharp sand, granite dust, or pourous tarmacadam |
Step 6 | A 10mm play pad is recommended |
Step 7 | A sand dressing is recommended for 4G surfaces - check product specification tab for infill rate |
Step 8 | Ensure that the joining tape and glue products are suitable for the project |
Step 9 | If using white /coloured line material install as per instructions. If using white or coloured line marking paint using a product suitable for artificial grass |
Step 10 | Discuss the above steps with your contractor |
Large/Full sized pitch - base required
These projects require further consideration, planning, and discussion. Please contact us.
Need guidance and assistance?
Call us on 01825 729259 or email us
Care and maintenance
DuraGame
This care and maintenance info sets out basic requirements for your new artificial grass sports or games surface. It is important to ensure the guidelines are followed, so to ensure you get the most enjoyment from the surface, that the lifetime and performance of the surface is maximised. Synthetic turf systems are not maintenance free, they are low maintenance.
Step 1 | Maintenance of the artificial surface is crucial to ensure maximum performance and enjoyment of the multi-use pitch. During the course of normal use the infill can be dispersed and the grass blades flattened so maintenance is required to redistribute the infill and lift the pile. A drag brush/compact tractor unit is required for this work |
Step 2 | Regular removal of leaves and litter will help to ensure that the surface and infill is not contaminated, leading to issues with drainage and performance |
Step 3 | Quarterly treatment for moss and weeds is recommended, using water based products. Once the treament has been applied all dead matter should be removed to avoid issues with drainage and performance |
Step 4 | Inspect the surface for damage and pay particular attention for any signs of roll joins opening up. Early remedial work is important where necessary |
Step 5 | Where paint has been applied to create lines, reapply as required. |
Need guidance or assitance?
Call 01825 729259 or email us
Products for DuraGame artificial grass installations
2024 Perfectly Green Product Brochure
High quality artificial grass for:
- Landscaping, homes, gardens, urban, and commercial
- Putting greens, sports, schools, and playgrounds
- Events, exhibitions, and hospitality